Can You Build More Than One ADU in Rosemead, CA?

Sean Curley • January 15, 2026

The Answer Depends if You Are Zoned For Single Family

The short answer is, “Yes!” You can build more than one accessory unit (ADU) on your property in Rosemead, California, but the specific number depends on whether your lot is zoned for a single-family home or a multifamily residence (like an apartment or duplex).


Because California state laws have been evolving rapidly as we enter into 2026, Rosemead must follow "ministerial" approval processes, meaning if you meet the state requirements, the city of Rosemead (and anywhere else in California) must grant the permit.


1. If you have a Single-Family Home


On a standard residential lot, you are generally allowed to have up to two accessory units in total:


  • One Full ADU: This can be detached (a standalone cottage) or attached to your main house.


  • One Junior ADU (JADU): This must be contained within the walls of your existing house (like a bedroom conversion) and is limited to 500 square feet. It must include an efficiency kitchen.


2. If you have a Multifamily Property


If your lot already has a duplex or an apartment building, the rules are even more generous:


  • Detached ADUs: Under SB 1211 (effective 2025/2026), you can build up to eight detached ADUs on the lot, provided the total number of ADUs does not exceed the number of existing primary units on the property.1


  • Converted ADUs: You can also convert non-habitable spaces (like storage rooms, garages, boiler rooms, or attics) within the existing building into ADUs. You are allowed at least one, or up to 25% of the existing unit count.


Key Rules to Keep in Mind


The maximum size is 1,200 sq. ft. for a detached ADU with 2+ bedrooms, and 800–850 sq. ft. for 1 bedroom or studio.


The setback minimum is 4 feet from side and rear property lines. No parking is required for the ADU if you are within 1/2 mile of public transit (which covers a lot of Rosemead).  The height limit is usually 16–18 feet for detached units. But the limit can go up to 25 feet if the unit is near public transit in some cases.


A Note on SB 9 (Lot Splits)

If you are seeking to do more than just add "accessory" units, Rosemead also allows SB 9 Urban Lot Splits. This allows you to split a single-family lot into two and build up to two units on each (a total of 4 units). However, if you use SB 9 to split the lot, you generally cannot add additional ADUs beyond those four units.


Reach out to us at SGV ADU Construction Contractors for more information on this or other ADU questions in Rosemead and all of the San Gabriel Valley. Our phone number is 626-900-0952 (click to call).

By Sean Curley February 6, 2026
San Marino Waived Some ADU Fees in 2026
By Sean Curley January 22, 2026
What Does Pasadena Allow For ADUs?
By Sean Curley December 6, 2025
ADU Conversion & Constructino has become significantly easier in the San Gabriel Valley (SGV) due to California's aggressive housing laws
By Sean Curley October 29, 2025
ADU Garage Conversion
By Sean Curley October 15, 2025
ADUs in San Gabriel Valley, CA
By Sean Curley October 2, 2025
Pasadena City Council Reduced ADU Fees in May 2025
By Sean Curley September 26, 2025
Overview of the California ADU Grant Program
By Sean Curley August 19, 2025
Income from ADU Rental
A woman is sitting at a desk using a calculator and a pen.
By Sean Curley July 27, 2025
Expert Strategies and Tips
A living room with a couch and a kitchen with a lot of windows.
By Sean Curley June 3, 2025
ADUs continue to be a hot topic of conversation in California
Show More